Abstract
One of the important factors for construction project success is managing the workers. It requires good leadership qualities in handling the workers’ issues. This paper presents a study on associating good leadership qualities with the workers issues of Saudi Arabia’s construction industry. The study was conducted within Makkah development region where all the construction workers are foreigners. A questionnaire survey involved 203 construction leaders who were asked to rate the degree of importance of each the identified leadership qualities in handling several construction workers issues. Collected data from this survey was used to develop PLS-SEM model which relates structural relationship of leadership qualities with the worker issues. Validation of the model shows that it is fit with Goodness of Fit (GoF) value of 0.30. The validated model indicates that problem solving group of qualities is the most dominant in handling workers issues.These findings are helpful for Saudi Arabia’s construction practitioners in handling workers issues effectively and thus ensure completion of construction projects timely.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.