Abstract

This paper focuses on the specific project of shield construction across the existing Wuzhun Railway Bridge between Xuanrendun Station and Dadiwobao Station on Urumqi Metro Line 1. A three-factor and four-level model of the Wuzhun Railway Bridge foundation reinforcement scheme is designed based on the principle of the orthogonal experiment. The calculation of each reinforcement scheme is conducted by using FLAC3D numerical simulation software. The optimal reinforcement scheme of the Wuzhun Railway Bridge foundation through orthogonal design-direct analysis and variance analysis is obtained. The reinforcement of the Wuzhun Railway Bridge is carried out according to the optimal scheme, and the rationality of the reinforcement scheme is verified by comparing and analyzing the numerical simulation data with the monitored data received from the construction site. The research results serve as a guide in the construction of future tunnel shield crossings for the existing railway, and the developed research methodology provides a reference for similar tunnel crossing projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.