Abstract

Necessity of creation of special automated systems based on lean manufacturing principles for efficient recourse usage and maximum customer-orientation was proved. Process of one of the planning system key elements such as structure of database creation is described. Importance of mixed development, includes technical task with description of subject area and problematics of solvable task and also variant of database structure, is explained. Provided initial and final structures of database after all stages of testing and adjustment with description of tables contents. Quantity of tables was increased from 9 to 25 in final version, this can be explained by the point that structure created only by planning specialist doesn’t include all specifics of process interpretation in automated system, and the fact is that iterative development is very important for such automation of processes. Provided research of methods that can increase speed of data processing was provided - specific type of key and algorithmic filling of data array by typical values.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.