Abstract

<p> This paper presents the design and construction of the Carouge-Bachet underground railway station in Switzerland. This design was largely determined by the local environmental constraints regarding the existing buildings and highways in the surroundings. The balance between the different construction techniques at each construction phase lead to progressive structural configurations affecting the behavior of the elements in time. The 33x32x21 m cube-shape station is built from top to bottom by using reinforced concrete diaphragm walls connected to different floors in successive stages that include the use of a pre-cambered steel-concrete beam (Preflex, normally used in bridge engineering) to take the lateral earth pressure and the use of vertical and horizontal temporary supports to liberate the space needed for the machines excavating the Pinchat Tunnel that starts from the station. This paper discusses the background of the design of the underground station.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.