Abstract

There is yet to be a fully assembled long-span steel structure system. This paper proposes a fully assembled cable-piercing ridge-tube cable dome (FCRCD) with a modular assembly ring truss (MART). A scale model of FCRCD with MART with a span of 10 m and a rise-span ratio of 1/10 was designed and manufactured, the static test of the scale model was conducted, and the finite element model (FEM) was established and analyzed. The structural behavior under different vertical loads was studied by static test and finite element analysis. Simultaneously, to further investigate the mechanical properties of the FCRCD in detail, the FEMs of the ridge-tube cable dome (RTCD) with MART and ridge-cable cable dome (RCCD) with MART were established and analyzed for comparison with the FCRCD with MART. The research results verified that the innovative FCRCD has good stiffness, stability, bearing capacity, and resistance to uneven load; the FEM method is correct, and the FEM analysis is accurate. The cable-piercing ridge tube (CRT) can limit the relaxation of the ridge cable to about 10%, improve the mechanical properties and tensioning efficiency, and reduce the prestressing loss of the FCRCD. The FCRCD is more favorable to the force state of the MART, and it is more suitable for long-span and super-long-span spatial structures and can meet the requirements of rigid roof laying.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.