Abstract

A natural extension of the makespan minimization problem on unrelated machines is to allow jobs to be partially processed by different machines while incurring an arbitrary setup time. In this paper we present increasingly stronger LP-relaxations for this problem and their implications on the approximability of the problem. First we show that the straightforward LP, extending the approach for the original problem, has an integrality gap of 3 and yields an approximation algorithm of the same factor. By applying a lift-and-project procedure, we are able to improve both the integrality gap and the implied approximation factor to $$1+\phi $$1+?, where $$\phi $$? is the golden ratio. Since this bound remains tight for the seemingly stronger machine configuration LP, we propose a new job configuration LP that is based on an infinite continuum of fractional assignments of each job to the machines. We prove that this LP has a finite representation and can be solved in polynomial time up to any accuracy. Interestingly, we show that our problem cannot be approximated within a factor better than $$\frac{e}{e-1}\approx 1.582\, (\hbox {unless } \mathcal {P}=\mathcal {NP})$$ee-1?1.582(unlessP=NP), which is larger than the inapproximability bound of 1.5 for the original problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.