Abstract

Research aim. The aim of the present research was an analysis of a metal ribbed ring-shaped dome metallic ribs stress state at different stages of a skeleton overhang erection process. The considered dome is hemispherical and is assembled bottom-up of individual elements. Due to a varying slope of meridional ribs elements at different relative elevations their stress state changes during mounting. The effect of the overhang erection process onto the stress state of the metal dome meridional ribs has been investigated. The relationship between the stress state of a meridional rib and mounting of each next dome skeleton tier has been established. Methods. A mathematical model of the metal ribbed ring-shaped dome assembled of steel H-shaped elements with rigid connections has been developed. Several extra models corresponding to different skeleton erection stages have been also generated to determine stresses in the meridional ribs at these stages. Response of each dome mathematical model under dead-weight load has been simulated. The obtained values of stresses in the meridional ribs within different models have been compared with corresponding design stresses values. Results. The dependence of the metal dome meridional rib stress state onto the stages of overhang erection process has been plotted. A degree of utilization of ribs steel strength at different erection stages has been represented by diagrams. An estimation of the dome skeleton stress state during overhang erection has been given. Imminence of assembly stresses during overhang erection and their influence onto dome structural reliability has been pointed out.

Highlights

  • The aim of the present research was an analysis of a metal ribbed ring-shaped dome metallic ribs stress state at different stages of a skeleton overhang erection process

  • A mathematical model of the metal ribbed ring-shaped dome assembled of steel H-shaped elements with rigid connections has been developed

  • Several extra models corresponding to different skeleton erection stages have been generated to determine stresses in the meridional ribs at these stages

Read more

Summary

НАУЧНАЯ СТАТЬЯ

Национальный исследовательский Московский государственный строительный университет, Российская Федерация, 129337, Москва, Ярославское шоссе, 26. Напряженное состояние меридиональных ребер металлического купола на разных этапах навесного монтажа // Строительная механика инженерных конструкций и сооружений. Выполнить анализ напряженного состояния меридиональных ребер металлического ребристо-кольцевого купола на разных стадиях навесного монтажа его каркаса. Созданы несколько дополнительных монтажных моделей неполного каркаса для исследования напряжений в ребрах купола на разных стадиях навесного монтажа. Так как все элементы обладают собственным весом, то прикрепление элементов каждого следующего яруса вызывает в частично собранной части купольного каркаса напряженное состояние. Поэтому в процессе возведения купола в элементах каждой монтажной расчетной схемы возникают напряжения, отличающиеся от напряжений в элементах каркаса проектной схемы, а также предыдущих монтажных схем. С целью выяснения характера напряженного состояния меридиональных ребер металлического ребристо-кольцевого купола на разных стадиях навесного монтажа его каркаса были выполнены специальные компьютерные исследования.

ANALYSIS AND DESIGN OF BUILDING STRUCTURES
Ni Ai
Список литературы
RESEARCH PAPER
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call