Abstract

A novel test setup has been used in this study to simulate stress corrosion cracking initiation under a disbonded coating on an X-65 pipeline steel. In this setup, the synergistic effects of cyclic loading, cathodic protection and soil solution environment under disbonded coatings have been considered. When the X-65 pipeline steel was exposed to the test environment, there existed a wide range of corrosion products on the steel surface in the gradient of cathodic protection. Increasing the test time and the maximum stress increased the possibility of stress corrosion cracking initiation in regions with a high susceptibility to pitting corrosion.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call