Abstract

It is taken one project of pipe installment in tunnel of China-Central Asia Line as one case. Set up one FEM contact element pairs, it simulates the relationship of pipe and thrust fault. With the thrust fault happening, the laying pipe occur large displacement, stress, and gap or pressure. Compare the maximum stress to 90% of allowable yield strength, it determines damage occurs or not about the pipe. Dislocation of ground face leads to pipe local shrinking, and then large tensile strain happens to local damage. To avoid that bad consequence, horizontal Compensators will be installed on tunnel both sides to coordinate deformation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.