Abstract

A stress analysis has been performed on proposed modifications to the Emergency Core Coolant System right and left side. For the right side thermal expansion and seismic loads were considered. Results of a previous report using dead weight, design LOCE, and LOCA loads were treated as valid and not repeated here. For the left side LOCE loading only was considered. The results of a previous analysis using dead weight, thermal, and LOCE loads were treated as valid and again not repeated here. Review of the analysis indicated that both proposed modifications pass the requirements of the ASME Boiler and Pressure Vessel Code Section III for Class 1 and 2 piping.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.