Abstract
Taking a start-up separator of 600 MW supercritical boiler as the study object, analyse the stress field of it during the process of load pick-up with the three-dimensional finite element analysis method. In the analytical process, it has calculated the thermal stress, mechanical stress and the total stress of them, and analysed the change rules of them, so it provide the guidance of the production operation processes. The calculation results show that: the thermal stress of open pore on start-up separator exists obvious stress concentration phenomenon; The stress concentration of the total stress occurred in the oval long axis of cylinder body wall, where is the danger point of the start-up separator.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.