Abstract
This paper deals with the stress analysis of a pipe flange connection with a spiral wound gasket using the elasto-plastic finite element method when an internal pressure is applied to the pipe flange connections with the different nominal diameters from 2″ to 20″. The effects of the nominal diameter of the pipe flange on the contact stress distributions at the interfaces and the hub stress are examined. Leakage tests of the pipe flange connections with 3″ and 20″ nominal diameters were conducted and measurement of the axial bolt force was also performed. The results by the finite element analysis are fairly consistent with the experimental results concerning the variation in the axial bolt force (Load factor). By using the contact stress distributions and the results of the leakage test, the modified gasket constants are proposed and compared with PVRC values. As a result, it is found that the variations in the contact stress distributions are substantial due to the flange rotation in the pipe flange connections with the larger nominal diameter. The hub stress has been overestimated by ASME method. In addition, a method to determine the bolt preload for a given tightness parameter and a rational design method for pipe flange connections are demonstrated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.