Abstract
The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn’t originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.