Abstract

SUMMARY Despite their magnificent load-carrying properties, some orthotropic steel plates in steel bridge decks are showing signs of reduced fatigue resistance. This has led to much costly repair and maintenance work that in turn restricts traffic flow, an issue of particular concern within the heavily occupied German highway system. Drawing upon the experience of the ship-building industry, which has encountered the same problem of fatigue-induced damage with roll-on/roll-off ferries, the viability of transferring Sandwich-Plate-System (SPS) technology to steel road bridges was considered. On behalf of the German Federal Ministry of Transportation, the Northrhine-Westfalia Department of Transportation and the state-owned company Strassen.NRW decided, therefore, to undergo a pilot project aimed at a permanent reconstruction and rehabilitation of orthotropic steel deck plates in a road bridge for the first time [1]. This paper reports on the reasons for such rehabilitation measures and the fundamental design issues of the project, and illustrates the repair work that has been done.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.