Abstract

Three bridges in Boone County, Missouri—Brown School Road, Coats Lane, and Creasy Springs Bridges—were selected for strengthening with carbon-fiber-reinforced polymer laminates in both shear and flexure. The objective of the rehabilitation program was to remove the 15-ton load posting that had been imposed on each of the bridges. To verify the results of the upgrade, load tests were performed before and after strengthening on tow of the bridges—Brown School Road and Coats Lane Bridges. This paper presents the procedures followed in the design, installation, and load testing of the bridges. A recommendation regarding the removal of the load posting is made.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.