Abstract

This study identified the causes of insufficient emergency interconnected operation (EIO) performance, such as pressure-related problems and connection problems caused by elevation differences between blocks, the characteristics and locations of emergency interconnection pipes (EIPs), and pumps. Then, it tested four strategies to improve the EIO performance, including increasing the EIP diameter or installing additional EIPs, pressure reducing valves (PRVs), or pumps. The advanced pressure-driven analysis model was applied to quantify the EIO performance improvement achieved using these strategies. Further, these strategies were tested in a real water distribution system. To solve the low-pressure problem, the EIP diameter was increased and an additional pump was installed; the former did not significantly improve, whereas the latter improved supply by 20–30%. To solve the high-pressure problem, PRVs were installed to maintain the EIO performance effectively. To solve connection problems, new EIPs were installed. Although this improved the supply performance, the installation of pumps was recommended to overcome elevation differences. The proposed strategies should contribute to the allocation of facilities such as EIPs, pumps, and PRVs for realizing effective EIO.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.