Abstract

PT. INTIDI is an industry engaged in the manufacture of concrete, the superior product is the u-ditch type. The casting process for making u-dich requires machine and manual handling by the workforce so that in the production process there are still facilities that can reduce labor productivity. The method used to increase labor productivity is Interpretive Structural Modeling (ISM). The ISM method was chosen because this method is simple and easy to understand and this method is used for the most important elements that must be addressed. Based on this research, the key element variable of leadership commitment is included in level 1, which means that this variable is the key or most important variable that must be addressed first and these results can increase labor productivity.
 Highlights :
 
 Leadership Commitment as the key element variable in increasing labor productivity through ISM.
 The simplicity and ease of understanding of ISM make it suitable for addressing critical aspects of U-Ditch concrete production.
 Focusing on the most important variables, such as leadership commitment, helps improve overall efficiency and effectiveness in the manufacturing process.
 
 Keywords - Interpretive Structural Modeling (ISM), Increased Productivity, key element

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call