Abstract
This main purpose of this paper is to study the implementation of the strategy for breaker failure under the condition of communication exchange in the power system. The method of breaker failure strategy in case of IEC61850 (Communication Networks and Systems in Substations) GOOSE (Generic Object Oriented Substation Event) aims to fast transmit signal to isolate faulty positions for maintaining safety security. The current strategy for breaker failure in substations is to use hardwire solutions to implement related applications for breaker failure. For integrating protective relays in substations, IEC61850 GOOSE schemes can customize a ring construct based on TCP/IP Ethernet to have flexible dispatch of smart grid solutions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.