Abstract

In today’s competitive power market integrated with industrial growth, capacity management becomes a perennial technical issue. Power utilities lose customers when they lack sufficient capacity to provide their demanded service which severely affects the business process of the industries. Interruption time is one of the key characteristics of quality service and customer satisfaction. While additional capacity improves service quality, but the cost for providing capacity increases. Thus, the capacity management is having a conflicting role with the utility effectiveness. The important strategy role of capacity management should be arriving at a point wherein it is optimally economical and maximising the customer satisfaction. A live case of Electrical Service Centre of Goa Electricity Department is modelled using Markov model by a code written in MATLAB 7.0 and the working of Electrical Service Centre was modelled in general purposes simulation system. Results, conclusions and future scope are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.