Abstract

In Ghana, the operating environment for construction firms is constantly changing in the face of a volatile economic environment, shifting political climate and a highly competitive market. Confronted with such instability, companies need strategic planning to combat the threat to their survival. A survey was conducted to determine how widespread strategic planning is used as a management tool by contractors in Ghana. Construction firms with classification A1B1, A2B2, D1 and D2 were used in the survey. Only 8.5% of D2 firms use strategic planning. The other firms have a combined average of 86.7%. Civil engineering contractors are far ahead of the building contractors in the practice of strategic planning. Strategic plans are drawn to cover an average of three years. There is an urgent need for contractors in the D2 class to be encouraged to seek insight into strategic planning and employ the technique to enhance their chances of surviving risks in the business environment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.