Abstract

Many options can be effectively used to meet the future power needs of a country in ways which would be more economically viable, environmentally sound, and socially just. A least-cost generation expansion planning study is conducted to find the economic feasibility of large scale integration of wind farms in Main interconnected transmission system of Oman. The generation expansion planning software used is WASP which is restricted in its capability to model intermittent nature of wind. Therefore, a wind turbine is modeled as a thermal plant with high forced outage rate related to its capacity factor. The result of the study has shown that wind turbines forms as part of the overall least-cost generation expansion plan for Main Interconnected System of Oman.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.