Abstract

This paper presents a maturity model for strategic planning of IS/IT called MMPE-SI/TI (Gov). The model has 5 maturity levels, 6 capability levels, 16 processes and 124 best practices for strategic planning of IS/IT directed by governmental organizations Brazilian. Among these processes, the process of Project Manage will be more fully defined in this paper, including best practices and the results obtained using field survey along with experts from IS/IT to demonstrate the importance, capacity, reliability and coherence of best practices in the maturity model for strategic planning of the study area. The article also presents a description of tools that can be used by organizations to implement the process focus of this study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.