Abstract

The Los Angeles Metro Orange Line is a bus rapid transit (BRT) system that accommodates cycling transit users (CTU) with front-of-the-bus mounted bike racks. However, cyclists sometimes find these bike racks full and are stranded until the arrival of the next bus. By collecting CTU usage data at seven Orange Line stations, the following results were observed: (1) CTUs are more likely to be stranded during weekday nights due to the proximity to three major colleges; on weekends, CTUs are more likely to be stranded in the mornings; (2) Metro’s policy that increased evening service during 2013 successfully decreased the number of stranded cyclists; and (3) when the racks are two-thirds full, approximately 20 percent of buses will strand at least one cyclist.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.