Abstract

T his article presents general empirical equations for predicting strand requirements in precast prestressed double tees and bridge girders for a given situation. It is assumed that the number of strands for a different span, loading and/or girder spacing is already known. The superimposed loads are assumed uniform for the case of double tees and according to AASHTO Specifications for the bridge girders. It is also assumed that service load stresses govern. The case of rectangular or Lbeams with straight strands is not discussed because the solution is straightforward, as shown in Appendix A. The given equations may be used directly in preliminary estimates or in computer program algorithms to accelerate convergence toward the exact solution. Another possible use for the formulas is in the feasibility studies for a new section where span and load ranges are sought.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.