Abstract

The movements of discrete points within the rockfill shoulders of two large embankment dams have been measured during construction. From these measured movements the strains developed in the rockfill during construction have been calculated. The results are presented in the form of trajectories of major principal strain and contours of major, minor and ratio of minor to major, principal strain. Incremental and cumulative strains are presented for different stages of construction. The development of strains during construction in the two embankments gives an insight into the behaviour of two types of embankment dam construction. Les mouvements de points discontinus dans la base de remblai rocheux de deux grands barrages ont été mesurés pendant la construction. À partir de ces mouvements mesurés, on a calculé les déformations dans les remblais rocheux pendant la construction. Les résultats sont présentés sous forme de trajectoires de contrainte principale majeure et de l'enveloppe des contraintes principale majeure, mineure et le rapport de mineure à majeure. Des déformations partielles et cumulatives sont présentées pour des phases différentes de la construction. L'évolution des déformations des deux remblais pendant la construction, donne un aperçu du comportement de deux types de construction de barrages en remblai rocheux.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call