Abstract

The objective of this research project was to compare two stormwater management strategies within a nutrient-sensitive watershed: impervious cover limits versus pollutant-load regulations. A case study was conducted in the nutrient-sensitive Falls Lake watershed in North Carolina, USA, where a commercial fitness complex was constructed in a zone previously restricted to low-density housing. The Falls Lake watershed has a stormwater regulation that limits total nitrogen and total phosphorus export loads to 2.47 kg/ha/yr and 0.37 kg/ha/yr, respectively. Hydrology and water quality were monitored pre- and post-development to quantify changes to stormwater volumes, pollutant concentrations, and annual export loading rates. On-site stormwater control measures (SCMs) reduced nutrient export loading rates below the regulatory standard. However, increased stormwater volumes and nutrient export loading rates were observed from pervious surfaces that were disturbed during construction (total nitrogen increased from 2.06 to 4.24 kg/ha/yr, total phosphorus increased from 0.41 to 0.73 kg/ha/yr). Results from this case study suggest that (1) impervious cover limits do not adequately account for a parcel's nutrient export loads and (2) SCMs that reduce volume and treat pollutants can reduce nutrient export loads below regulatory levels in the Falls Lake watershed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.