Abstract

Large solar power stations usually locate in remote areas and connect to the main grid via a long transmission line. Energy storage unit is deployed locally with the solar plant to smooth its output. Capacities of the grid-connection transmission line and the energy storage unit have a significant impact on the utilization rate of solar energy, as well as the investment cost. This paper characterizes the feasible set of capacity parameters under a given solar spillage rate and a fixed investment budget. A linear programming based projection algorithm is proposed to obtain such a feasible set, offering valuable references for system planning and policy making.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.