Abstract
A model of a single-item make-to-stock production system is presented. The item is demanded by several classes of customers arriving according to Poisson processes with different backorder costs. Item processing times have an Erlang distribution. It is shown that certain structural properties of optimal stock and capacity allocation policies exist for the case where production may be interrupted and restarted. Also, a complete characterization of the optimal policy in the case of uninterrupted production when excess production can be diverted to a salvage market is presented. A heuristic policy is developed and assessed based on the results obtained in the analysis. Finally the value of production status information and the effects of processing time variability are investigated. [Supplemental materials are available for this article. Go to the publisher's online edition of IIE Transactions for the following free supplemental resource: Appendix]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.