Abstract
The problem of scheduling n jobs in a two-machine flowshop with constant and known processing times is considered with the total flowtime performance measure. The machines are subject to random breakdowns and there is no waiting space between them. The problem is formulated and an expression for the completion time of the jobs is obtained in terms of the processing times and the breakdown elements. Provided that the counting processes associated with both machines have stationary increments property, a sequence that stochastically minimizes the performance criterion is established for the cases when only the first or the second machine suffers breakdowns.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.