Abstract

Proactive preparedness to cope with emergencies, especially those of nature origins, significantly improves the resilience and minimizes the restoration cost of electric power systems. In this paper, a proactive resource allocation model for repair and restoration of potential damages to the power system infrastructure located on the path of an upcoming hurricane is proposed. The objective is to develop an efficient framework for system operators to minimize potential damages to power system components in a cost-effective manner. The problem is modeled as a stochastic integer program with complete recourse. The large-scale mixed-integer equivalence of the original model is solved by the Benders' decomposition method to handle computation burden. The standard IEEE 118-bus system is employed to demonstrate the effectiveness of the proposed model and further discuss its merits.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.