Abstract

Abstract This paper proposes a new coordination operation mode of wind farm (WF) and pumped-hydro-storage plant (PHSP) based on day-ahead wind power output forecasts. Firstly, a deterministic mixed integer programming (MIP) formulation is built considering the constraints of unit total startup and shutdown frequencies, as well as unit state exclusion between pumping and generating. Secondly, the paper presents the chance-constrained and scenario-based optimization formulations to deal with errors of wind power forecast. These two formulations target on maximizing the expected profit of joint operation of WF and PHSP. Case studies and sensitivity analyses are conducted, which demonstrate that the coordination of WF and PHSP can greatly alleviate the negative effect of wind power fluctuations on power grid and also increase remarkable profit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.