Abstract

In this paper, a stochastic framework including two hierarchical stages is presented for the operation of distribution networks with high penetrations of wind power. In the first stage termed Day Ahead Market Stage (DAMS), the power purchases from the day-ahead market and commitment of distributed generations (DGs) are determined. The DAMS model is formulated as a mixed integer linear programming optimization problem. The uncertainty in predictions of wind generation, real time prices, and load profile are included in the optimization problem according to a scenario-based stochastic programming approach. The risk encountered due to the uncertainties is also taken into account. The objective is to minimize the expected operation cost while satisfying the acceptable level of risk. In the second stage named Real Time Market Stage (RTMS), the power purchases from the real time market, dispatch of committed DGs, load curtailment invocations, and hourly reconfigurations are determined. In each hour, the RTMS problem is solved based on the information of that hour and next few hours. To prevent large numbers of switching operations during a day, the switching cost of reconfiguration is considered. The RTMS is modeled as a mixed integer conic programming problem. To analyze the proposed framework, the IEEE 33-bus DN is used as a case study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.