Abstract

This paper deals with stochastic scheduling of nuclear power plant outages. Focusing on the main constraints of the problem, we propose a stochastic formulation with a discrete distribution for random variables, that leads to a mixed 0/1 quadratically constrained quadratic program. Then we investigate semidefinite relaxations for solving this hard problem. Numerical results on several instances of the problem show the efficiency of this approach, i.e., the gap between the optimal solution and the continuous relaxation is on average equal to 53.35 % whereas the semidefinite relaxation yields an average gap of 2.76 %. A feasible solution is then obtained with a randomized rounding procedure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.