Abstract

In conjunction with TIMET at Waunarlwydd (Swansea, UK) a model has been developed that will optimise the scheduling of various blooms to their eight furnaces so as to minimise the time taken to roll these blooms into the finished mill products. This production scheduling model requires reliable data on times taken for the various furnaces that heat the slabs and blooms to reach the temperatures required for rolling. These times to temperature are stochastic in nature and this paper identifies the distributional form for these times using the generalised F distribution as a modelling framework. The times to temperature were found to be similarly distributed over all furnaces. The identified distributional forms were incorporated into the scheduling model to optimise a particular campaign that was run at TIMET Swansea. Amongst other conclusion it was found that, compared to the actual campaign, the model produced a schedule that reduced the makespan by some 35%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.