Abstract

One of the main characteristics of wind power is the inherent variability and unpredictability of the generation source, even in the short-term. To cope with this drawback, hydro pumped-storage units have been proposed in the literature as a good complement to wind generation due to their ability to manage positive and negative energy imbalances over time. This paper investigates the combined optimization of a wind farm and a pumped-storage facility from the point of view of a generation company in a market environment. The optimization model is formulated as a two-stage stochastic programming problem with two random parameters: market prices and wind generation. The optimal bids for the day-ahead spot market are the ldquohere and nowrdquo decisions while the optimal operation of the facilities are the recourse variables. A joint configuration is modeled and compared with an uncoordinated operation. A realistic example case is presented where the developed models are tested with satisfactory results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.