Abstract
A stochastic goal programming (GP) model is developed in orderto determine the daily production of desalination plants to meet the requirements of water blending stations (WBS) for major cities in the Eastern Province of the Kingdom of SaudiArabia. The WBS is assumed to be a control point in the systemwhere water is blended to satisfy the desired water quality, downstream of the control point. The desalinated water is blended with brackish groundwater extracted from several groundwater wells. The objective of the model is to minimize the goal deviations from the following priority levels: demand for blended water, control of salinity levels, depletion of groundwater and maximize the use of brackish water, demand forbrackish water at WBS, and production of desalinated water. Anessential element of the model is the input data; unfortunately,available data are not accurate due to the inherent uncertaintyassociated with it. This uncertainty will generate uncertainty in the model output, which affects reliability and confidence associated with the decisions. Thus, reliable planning should consider uncertainties associated with model input parameters.The developed stochastic model shows how Goal Programming (GP)modeling can be used to plan the water resources in the EasternProvince of Saudi Arabia, assuming that both supply and demandare uncertain.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.