Abstract
This paper proposes stochastic energy management for an electrical system consisting of a multi-microgrid and a distribution company (DISCO). The objective function aims at finding an optimal day-ahead energy schedule of dispatchable resources, energy storages, and demand response in the presence of intermittent renewable energy sources. Two different energy storage devices, i.e., battery and supercapacitor (SC), are modeled in the system to provide both high power and energy density. Wind speed, solar irradiation, and electrical demand uncertainties have been modeled using probability density functions of uncertain parameters, and the number of scenarios has been decreased using mixed-integer linear programming (MILP) based scenario reduction with a novel characteristic. In the proposed model, the DISCO, as a leader, attempts to maximize its profit while the microgrids (MGs), as followers, tend to minimize their operational costs. Karush-Kuhn-Tucker, strong duality, and Fortuny-Amat transformation are used to convert the non-linear bi-level problem into a linear single-level problem. The proposed model was tested on a hypothetical distribution system and the results showed the efficiency of the model in reducing operational costs of MGs by 7.5%, increasing the DISCO profit by 6.9%, and improving the reliability of the system by reducing the energy not supplied.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.