Abstract

: As with all dynamic programming formulations, differential dynamic programming (DDP) successfully exploits the sequential decision structure of multi-reservoir optimization problems, overcomes difficulties with the nonconvexity of energy production functions for hydropower systems, and provides optimal feedback release policies. DDP is particularly well suited to optimizing large-scale multi-reservoir systems due to its relative insensitivity to state-space dimensionality. This advantage of DDP encourages expansion of the state vector to include additional multi-lag hydrologic information and/or future inflow forecasts in developing optimal reservoir release policies. Unfortunately, attempts at extending DDP to the stochastic case have not been entirely successful. A modified stochastic DDP algorithm is presented which overcomes difficulties in previous formulations. Application of the algorithm to a four-reservoir hydropower system demonstrates its capabilities as an efficient approach to solving stochastic multi-reservoir optimization problems. The algorithm is also applied to a single reservoir problem with inclusion of multi-lag hydrologic information in the state vector. Results provide evidence of significant benefits in direct inclusion of expanded hydrologic state information in optimal feedback release policies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.