Abstract

In this paper we address the stochastic cyclic scheduling problem in synchronous assembly and production lines. Synchronous lines are widely used in the production and assembly of various goods such as automobiles and household appliances. We consider the cycle time (or throughput rate) performance criterion as the objective of the scheduling problem with the assumption that the processing times are independent random variables.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.