Abstract

The ion guide isotope separator facility IGISOL of the University of Jyväskylä has been moved to the new K-130 heavy ion cyclotron laboratory. The totally reconstructed facility is described in detail. The primary beams and targets, helium pumping, separator beam line construction and separator beam diagnostics are discussed. The spectroscopy stations are introduced with illustrative examples from the research program, including beta-delayed proton and neutron spectroscopy, gamma-ray spectroscopy with and without arrays, conversion electron spectroscopy, collinear laser spectroscopy and nuclear level lifetime spectroscopy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.