Abstract

The upcoming machines, the SIS100 accelerator and the NICA booster and collider are a direct offspring of the successful NUCLOTRON magnet concept. SIS100 is now being realized with the dipoles ordered. NICA is in its R&D stage with the first prototype magnets built. The experience gained in the GSI-JINR collaboration dedicated to improving the magnets during the last decade of R&D led now to the common agreement to realize the magnet production and testing in a cooperation for both projects. We describe the parameters, the optimization and tradeoffs made for these magnets and outline the differences. The status of the different magnets next to first results obtained on model or prototype magnets are given. Special attention is given to the advantages of cooling the superconducting magnets with a forced two-phase Helium flow.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.