The Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) was constructed at Los Alamos National Laboratory as a radiographic facility to provide dual-axis multi-time radiography to support the US Stockpile Stewardship Program. The DARHT 1 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">st</sup> Axis has been operational since 1999 and has been providing excellent radiographs. The DARHT 2 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">nd</sup> Axis construction project was completed in early 2003. However, during the subsequent commissioning efforts to bring it to the full specifications of 17 MeV, 2 kA and 2 microsecond pulse length, high voltage breakdown was observed in several of the 78 induction accelerator cells. In January 2004, the DARHT 2 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">nd</sup> Axis Refurbishment and Commissioning Project was launched. It is a Los Alamos National Laboratory effort in collaboration with the Lawrence Livermore and Lawrence Berkeley National Laboratories. Its purpose is to first address the HV breakdown problems with the 2 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">nd</sup> Axis accelerator cells, address the remaining physics of the multi-pulse electromagnetic kicker and X-ray converter target and then commission the full energy 2 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">nd</sup> Axis accelerator. The redesign of the cell as well as long pulse beam stability tests were completed in 2005. Testing of the multi-pulse electromagnetic kicker and X-ray converter target was completed in February of this year using an 8 MeV scaled accelerator that used twenty-six refurbished accelerator cells. Commissioning of the 2 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">nd</sup> Axis 2.5 MV, 2.0 kA electron injector and the full-energy accelerator beamline is currently underway. Commissioning of the downstream transport section and multi-pulse kicker will begin in early October of 2007 after accelerator commissioning is completed. Target commissioning is scheduled to begin in November 2007. The DARHT 2 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">nd</sup> Axis is scheduled for completion in early 2008, at which point the DARHT facility will be ready to support two-axis, multi-pulse radiography in support of the Stockpile Stewardship Program. In this paper, we present the overall project status, commissioning strategy and schedule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.