Abstract
The superconducting magnet system for the J-PARC neutrino beam line for the T2K experiment has been served for the beam operation without serious disturbance since April 2009. Present most concern of the system is the operational current limit of superconducting corrector magnets for beam steering due to systematic quenches at lower currents. Operational experience of the magnet system and examples of troubleshoot including countermeasures against the corrector magnet quenches are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.