Abstract

Active work under the recently authorized project relating to floods and their frequencies began in March, and such progress as may be reported at this time is largely that of organization and preliminary planning.One of the outstanding and impressive features of the organization is the provision for cooperative effort, whereby the mature judgment and possibly diverse viewpoints of various committees and consultants may be utilized to the fullest advantage. This arrangement should provide the necessary safeguard against adoption of immature individual views or favorite methods of analysis, to the exclusion of others of equal or greater merit. On the other hand, it is conceivable that too much of the limited time might be consumed in preliminary discussions of basic principles, methods of analysis, and formulas dealing with either magnitude or frequency of floods, if unanimity of opinion among several professional groups must precede the main work under the project authorized. In effect, such a procedure would require a practical and workable solution before the basic data had become available. To avoid such delays, a definite line of procedure has beer, proposed for consideration.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call