Abstract

The Indian LLCB TBM, currently under development, will be tested from the first phase of ITER operation (H–H phase) in one-half of the ITER port no-2. The present LLCB TBM design has been optimized based on the neutronic as well as thermal hydraulic analysis results. LLCB TBM R&D activities are primarily focused on (i) development of technologies related to various process systems such as Helium, Pb–Li liquid metal and tritium, (ii) development and qualification of blanket materials viz., structural material (IN-RAFMS), tritium breeding materials (Pb–Li, and Li2TiO3), (iii) development and qualification of fabrication technologies for TBM system. The present status of LLCB TBM design activities as well as the progress made in major R&D areas is presented in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.