Abstract

SynopsisCRYRING was moved from Stockholm to Darmstadt, modernized and integrated into the GSI/FAIR beamline topology behind ESR. As CRYRING@ESR, it will receive and store heavy, highly charged ions from all species the present accelerator chain is capable of producing. An extensive research program on low-energy atomic collisions, spectroscopy and nuclear reactions was proposed. The facility is gradually completing commissioning, ion beams from the local injector branch have already been stored and prototype experiments performed. We present the machine status and highlight some planned experiments.

Highlights

Read more

Summary

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.