Abstract

Installed in the late 1980s the gas inlet system of ASDEX Upgrade was state of the art at the time of commissioning. However, after more than 20 years of operation a redesign was needed to take the growing complexity of experimental scenarios into account and to replace out-dated components.A conceptual design based on a study of operational requirements as well as available resources was developed and the gas inlet system was renewed step by step during planned maintenance shutdowns of AUG over the last years. The improvement comprises the building of a gas supply station, construction of a system for the gas assignment, relocation of the operational gas inlet and inside-vessel gas guiding as well as a redesign of the communication with the control system. Since the campaign 2014 the renewed system is in routine operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.