Abstract
A statistical planning method is developed for expanding electric power transmission networks when the bus load forecast and operating conditions are uncertain. This method seeks the minimum cost network expansion plan which guarantees a specified level of probability of supplying the uncertain substation load-demands without overloading any circuits while dispatching the generators economically under normal operating conditions and minimizes the probability of load shedding under outage conditions. The approach taken is to formulate the planning problem as a set imbedding problem which is solved using standard constrained optimization methods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.