Abstract

The goal of this project is to examine the potential for LCUP (least-cost utility planning) by estimating when and where demand-side measures can make a difference in utility resource plans. We make this assessment by linking utility interest in LCUP to a variety of economic and regulatory factors that influence utility resource planning decisions. We have developed two sets of indicators: economic indicators that describe the electricity demand and supply picture by NERC regions and states; and regulatory indicators that summarize the institutionalization of some kind of least cost planning process by state. 14 refs., 15 figs., 3 tabs.