Abstract

Family based dispatching rules reduce time spent on setups to improve system performance. However, they can lead to bulky arrivals at subsequent stages, causing additional delays. Few studies have considered this effect so far. Preemption, on the other hand, can enforce the deadlines of important jobs in real situations. This study deals with a new production control problem of family based dispatching rules and preemption. No research has addressed both family based dispatching rules and preemption. A new framework of decision making is presented to solve this problem. The analysis of family based dispatching rules and preemption is carried out at a two-stage flow shop by simulation modeling and statistical analysis to discover several key factors. In addition, this research investigates the performance differences among different preemption types with respect to family based dispatching rules. The results of this paper can offer insight into the use of preemption, especially with family based dispatching rules.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.